Image showing the planned Design for the Nevis Athletics Facility at Long Point – Phase 1 substantially completed with Mondo covered 400m, 9 Lane Track and 4 Lane-200m Warm-up Track (with drainage), Landscaping (immediately around the Track), Remote controlled LED Lighting for Track & Field area, Warm-up track, Football Field (with automatic sprinklers) and preliminary fencing. Phase 2 to include a 100m – 3 story Pavilion, Parking areas, Stands for Athletes & Spectators, Access Road (under construction), Track/Field equipment, Giant Electronic Display board & more.
Possible and/or Planned Meets for 2018 includes Development Meets, School Meets, A1 Titans Relay Championship & Titans Grand Prix Meet, Nevis Primary Schools Championship, Nevis High Schools Championship, St. Kitts/Nevis Youth Meet, Leeward Islands Youth or Junior Meet, other Local, Regional and/or International Meet. Recent Photos of the Facility have been added below with more to be added soon.